Connect enquiry, approved revision and dispatch readiness
Coordinate drawings, materials, purchasing and completion records around the version the customer actually accepted. Engineering decisions remain with the responsible specialist.
For Production manager, estimator or fabrication owner
An MRP system may already cover standard production. Custom work helps when email specifications, drawing revisions and customer-specific approvals interrupt the route into that system.
Connect the records you already use
RFQs, drawings and revision registers
ERP, bills of materials and supplier quotes
Production schedules and quality records
Access, data quality and write permissions are checked during scoping. Integration availability depends on your systems.
Agree who can change rules, approve exceptions and authorise each write. Keep a history of source records, rule versions and action results. Detect partial failures, reconcile before retrying and assign unresolved cases to a named owner.
AI can extract, classify and prepare information. Validated rules and agreed permissions govern consequential actions; missing evidence triggers review. Test normal cases, exceptions and recovery against acceptance criteria before launch.
Related operating experience
See the foundations running at G3.
G3 is our founder’s retail and venue business in Melbourne. Explore relevant capabilities and their boundaries; your industry’s rules still need their own design and validation.
Start with a sanitised example, the result you need and one awkward case. We will map a bounded first implementation.
Can a system price a drawing without an engineer?
It can extract a costing brief and use approved repeat-job rules. Unclear tolerances, feasibility and new engineering assumptions need specialist review.
Do we have to replace our MRP?
No. First map which system owns materials, revisions and production status, then connect the missing handoffs and acceptance checks.
What happens if a drawing changes after purchasing or cutting starts?
Link the drawing revision to the affected quote, material order and job instructions. Compare what changed and identify work already committed or completed. Route cost, scrap and schedule decisions to the authorised owner before issuing a revised instruction; preserve the previous version and approval history.
Can we start with batch paperwork instead of replacing production planning?
A first scope could join the job reference, approved drawing, inspection status and delivery documents for one product family. Include a partially accepted batch and a rework case. Confirm how those records can be read from your MRP or current files before deciding whether dispatch records can also be updated.
Do we need an ongoing Canvo subscription?
No mandatory Canvo subscription. An agreed implementation includes 12 months of support for the delivered workflows, defects and minor compatibility changes to existing integrations. Optional proactive care and further development are scoped separately. Software, hosting and API costs remain separate.
Your operation, your rules
Bring the handoff that keeps going wrong.
Free workflow review. A$950 ex GST diagnostic. A bounded first deployment from A$4,900 ex GST, with 12 months of included support for the agreed implementation.